<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Lisa Cox Garden Designs Blog &#187; footings for wall</title>
	<atom:link href="http://blog.lisacoxdesigns.co.uk/tag/footings-for-wall/feed/" rel="self" type="application/rss+xml" />
	<link>http://blog.lisacoxdesigns.co.uk</link>
	<description>A Garden Designer&#039;s Journal</description>
	<lastBuildDate>Fri, 14 Jun 2013 17:23:16 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
		<item>
		<title>From the drawing board: Construction of my front garden days 2 &amp; 3</title>
		<link>http://blog.lisacoxdesigns.co.uk/from-the-drawing-board/from-the-drawing-board-construction-of-my-front-garden-days-2-and-3/</link>
		<comments>http://blog.lisacoxdesigns.co.uk/from-the-drawing-board/from-the-drawing-board-construction-of-my-front-garden-days-2-and-3/#comments</comments>
		<pubDate>Thu, 29 Mar 2012 16:58:06 +0000</pubDate>
		<dc:creator>Lisa Cox</dc:creator>
				<category><![CDATA[From the drawing board]]></category>
		<category><![CDATA[concrete block walls]]></category>
		<category><![CDATA[footings for wall]]></category>
		<category><![CDATA[Front Garden Design]]></category>
		<category><![CDATA[Leatherhead]]></category>
		<category><![CDATA[MOT type 1 Sub-base]]></category>
		<category><![CDATA[soil excavation]]></category>

		<guid isPermaLink="false">http://blog.lisacoxdesigns.co.uk/?p=2729</guid>
		<description><![CDATA[Whilst I have been out and about at various meetings this week, progress has continued in my front garden.  So far we have around 20 mins of time-lapsed video so I think it will need some serious editing before I post it here for you to see!  Days 2 and 3 were predominantly focussed on [...]]]></description>
				<content:encoded><![CDATA[<p>Whilst I have been out and about at various meetings this week, progress has continued in my front garden.  So far we have around 20 mins of time-lapsed video so I think it will need some serious editing before I post it here for you to see!  Days 2 and 3 were predominantly focussed on the walls and excavation of soil to prepare for the sub-base which is being installed as I write.</p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Front-garden-in-Leatherhead-Day-2.jpg"><img class="alignnone size-full wp-image-2730" title="Front garden in Leatherhead Day 2" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Front-garden-in-Leatherhead-Day-2.jpg" alt="" width="768" height="514" /></a></p>
<p>By the end of Tuesday the side wall by the garage had been rebuilt and the footings for the new wall on the other side and front of the garden were laid.</p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Footings-for-wall.jpg"><img title="Footings for wall" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Footings-for-wall.jpg" alt="" width="768" height="514" /></a></p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Footings-for-wall-and-side-wall-rebuilt.jpg"><img class="alignnone size-full wp-image-2733" title="Footings for wall and side wall rebuilt" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Footings-for-wall-and-side-wall-rebuilt.jpg" alt="" width="768" height="514" /></a></p>
<p>Work progressed really quickly on Day 3 and the other 2 walls went up before lunch&#8230;</p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/New-blockwork-walls-Day-3.jpg"><img class="alignnone size-full wp-image-2735" title="New blockwork walls - Day 3" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/New-blockwork-walls-Day-3.jpg" alt="" width="768" height="514" /></a></p>
<p>Already it was feeling as if it was taking shape.  Even whilst the walls are bare blockwork, they still look a hundred times better than the old walls, much cleaner and when the render goes on later in the week they&#8217;ll look really crisp and elegant.</p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Front-garden-in-Leatherhead-Day-3.jpg"><img class="alignnone size-full wp-image-2734" title="Front garden in Leatherhead Day 3" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/Front-garden-in-Leatherhead-Day-3.jpg" alt="" width="768" height="514" /></a></p>
<p>You may also notice that there has been some more soil removal to take the levels down far enough to allow for the sub-base material which is actually being installed as I write but I&#8217;ll document that in a later post.</p>
<p><a href="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/excavated-base-ready-for-membrane-and-MOT-Type-1-sub-base.jpg"><img class="alignnone size-full wp-image-2731" title="excavated base ready for membrane and MOT Type 1 sub-base" src="http://blog.lisacoxdesigns.co.uk/wp-content/uploads/2012/03/excavated-base-ready-for-membrane-and-MOT-Type-1-sub-base.jpg" alt="" width="768" height="514" /></a></p>
<p>It might seem as though not much has happened since Monday, but like any project, it&#8217;s the preparation that takes the time.  Once the sub-base is in and the setts start to be laid it will feel as if progress is speeding up.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://blog.lisacoxdesigns.co.uk/from-the-drawing-board/from-the-drawing-board-construction-of-my-front-garden-days-2-and-3/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
